Home > Renovation tips > Deck Installation
Renovation tips

Deck Installation

You plan to have a treated deck board next summer?
Why do not you build it yourself?
With this video, you’ll save time and money: become a pro of renovations!

Equipment required

Fondation (sonotube)

  • JJ8505 Hydraulic auger – 1 person (extenstion included)
  • JJ4205 Hydraulic auger – 2 people (extension included)
  • JJ4508 Manual auger
  • BB2228 Electronic level

Construction

  • 10" Mitter saw (BO1024) + 10" blade (BO0108)
  • 12" Mitter saw (BO1224) + 12" blade (BO1208)
  • Circular saw (BO2134) + 8" ¼ blade (BO0818)
  • Frame nailer (AA1601)
  • Compressor 110 V (AA5604)
  • 50' Air hose (AA3841)